The governing body shall change or supplement the floodplain zoning district boundaries and this chapter in the manner outlined in §
256-31 below. Actions which require an amendment to the ordinance and/or submittal of a letter of map change (LOMC) include, but are not limited to, the following:
A. Any fill or floodway encroachment that obstructs flow causing any
increase in the regional flood height;
B. Any change to the floodplain boundaries and/or watercourse alterations
on the FIRM;
C. Any changes to any other officially adopted floodplain maps listed in §
256-5B(2);
D. Any floodplain fill which raises the elevation of the filled area
to a height at or above the flood protection elevation and is contiguous
to land lying outside the floodplain;
E. Correction of discrepancies between the water surface profiles and
floodplain maps;
F. Any upgrade to a floodplain zoning ordinance text required by Wis.
Admin. Code, § NR 116.05, or otherwise required by law,
or for changes by the municipality; and
G. All channel relocations and changes to the maps to alter floodway
lines or to remove an area from the floodway or the floodfringe that
is based on a base flood elevation from a FIRM requires prior approval
by FEMA.