A.
Requirement. A certified survey map prepared by a Wisconsin professional land surveyor shall be required for all minor land divisions. It shall comply in all respects with the requirements of § 236.34, Wis. Stats., as amended from time to time, and with all applicable requirements of this chapter. Without limitation, the certified survey map shall comply with the design standards and public improvement requirements set forth in Articles VII and VIII of this chapter.
[Amended 8-3-2020 by Ord. No. 20-22]
B.
Uses and limitations. In addition to the use specified in Subsection A above, a certified survey map may be used to change the boundaries of lots, blocks and outlots within a recorded final plat or certified survey map if the redivision does not result in a subdivision and does not violate any provisions of this chapter. A certified survey map shall not alter the exterior boundaries of a recorded plat, alter areas previously dedicated to the public by any plat or certified survey map or alter any restriction placed on platted or mapped land by covenant, by grant of easement or by any other means.