A.
Scale accuracy, location of manhole invert and top casting
elevation and numerical notation of the exact elevations of the same as determined
by field survey after construction are to be shown on all plans. Elevations
shall be in datum of the Sanitary District.
B.
It shall be required that a responsible representative
of the developer or owner accompany the Administrator or his/her agent on
the final inspection. The developer or owner shall furnish whatever labor
is necessary for conducting the final inspection.
C.
Deficiencies which are found to exist during the inspection
shall be pointed out to the developer or owner's representative. Subsequent
to the inspection, the developer or owner shall be furnished, in writing if
requested by the developer or owner, a summary of the deficiencies found and
corrections of which are required.
D.
On notification that all construction deficiencies have
been completed, the Administrator or his/her agent will inspect all such work.