A.
All significant industrial users proposing to connect
to or contribute to the POTW shall obtain an industrial discharge
permit before connecting to or contributing to the POTW. All existing
significant users connected to or contributing to the POTW shall obtain
an industrial discharge permit within 180 days after the effective
date of the ordinance from which this article derives (Ordinance Number
1-1987).
B.
Any violation of the terms and conditions of the industrial discharge permit shall be deemed a violation of this Part 2 and subjects the industrial user to the sanctions set out in Article V, Legal Action. Obtaining a discharge permit does not in any way relieve the industrial user of its obligation to comply with all federal, state and local laws.
[Added 5-31-1994]