This chapter shall apply to all construction, including, but
not limited to, all additions, alterations, modifications, repairs,
and improvements, that require a building permit.
(Ord. 1729 § 2, 2007)
|
Estimated value as determined by the chief building official
|
Time limit from building permit issuance
| ||
|---|---|---|---|
|
|
|
Not over $50,000.00
|
6 months
|
|
$50,001.00
|
—
|
$500,000.00
|
12 months
|
|
$500,001.00
|
—
|
$1,000,000.00
|
18 months
|
|
$1,000,001.00
|
—
|
$3,000,000.00
|
24 months
|
|
$3,000,001.00
|
|
and over
|
36 months
|
|
Applicable Time Limit
|
Penalty Fine
|
|---|---|
|
First 30 days
|
-0-
|
|
31st day through 60th day
|
$200.00 per day up to $6,000.00 maximum
|
|
61st through 120th day applicable to this 60-day period
|
$400.00 per day up to $24,000.00 maximum
|
|
121st day and every day thereafter
|
$1,000.00 a day per day to a maximum of $250,000.00
|